View Issue Details

IDProjectCategoryView StatusLast Update
000128110000-004: Servicespublic2012-02-09 22:43
ReporterNathan PocockAssigned ToMatthias Damm  
PrioritynormalSeverityminorReproducibilityalways
Status closedResolutionfixed 
Fixed in Version1.02 
Summary0001281: SetTriggering: process ordering of add/delete parameters
Description

The specification makes no attempt to clarify parameters importance for the linksToAdd and linksToDelete.

Scenario:
Client adds 1 item and removes 1 item from an established triggering scenario, where the NodeId in linksToAdd is the same as specified in linksToRemove.

Propose:
Specification to suggest a server process the linksToAdd first, followed by linksToDelete.

TagsNo tags attached.
Commit Version
Fix Due Date

Activities

Randy Armstrong

2010-07-06 16:55

administrator   ~0001905

July 6th - Process remove first - then process add.

Matthias Damm

2011-03-13 21:11

developer   ~0002395

Added clarification that the list of links to remove is processed before the list to add.

Change is part of the draft version "OPC UA Part 4 - Services Draft 1.02.02 Body.doc"

Randy Armstrong

2011-05-23 11:10

administrator   ~0002717

Reviewed in Walldorf

Issue History

Date Modified Username Field Change
2010-06-21 15:21 Nathan Pocock New Issue
2010-07-06 16:55 Randy Armstrong Note Added: 0001905
2010-07-06 16:55 Randy Armstrong Status new => assigned
2010-07-06 16:55 Randy Armstrong Assigned To => Matthias Damm
2011-03-13 21:11 Matthias Damm Status assigned => resolved
2011-03-13 21:11 Matthias Damm Resolution open => fixed
2011-03-13 21:11 Matthias Damm Note Added: 0002395
2011-05-23 11:10 Randy Armstrong Status resolved => closed
2011-05-23 11:10 Randy Armstrong Note Added: 0002717
2012-02-09 22:43 Jim Luth Fixed in Version => 1.02